Contact Phone: +49-5971-9848212 E-Mail: info(at)reselite.de 48432 Rheine Germany
© 2011-2021 RES-ELITE | Impressum
Look too:
Wind turbines from Europe Used wind turbines Wind turbines from Germany New wind turbines from Europe and Germany
Wind power is rapidly growing throughout the world. Wind energy is referred to as renewable energy and is increasingly referred to as “Green Energy”. The only necessary resource for the use of energy produced by wind power installation (wind turbine) is wind. Thus, the use of this type of energy refers not only to the economically beneficial, but also to one of the most environmentally friendly. By the end of 2017, the total installed capacity of all wind generators in the world was 539 GW and, thus, surpassed the total installed capacity of nuclear energy. Total installed capacity, MW according to GWEC (Global Wind Energy Council) From the data in the table, the fact of the rapid development of the wind power industry is obvious. What you need to know in order to purchase / order new wind turbine and where to start Any manufacturer of wind turbines to start calculating new wind turbine requires data on the wind. To do this, hire a qualified and recognized by Europe company that produces complete study of the wind in the specified area. What research is conducted: Wind speed at various altitudes (60, 70, 80, 90, 100, 110, 120, 130 meters) Airflow density Humidity Also requires data on minimum and maximum air temperatures These wind analysis studies are conducted for at least one year. Based on the data obtained, the manufacturer starts calculating suitable wind turbine for the area. What means “suitable wind turbine” is a wind turbine that will produce electricity with the maximum coefficient in this particular area. Ie, the rated power, mast height, diameter of the rotor of the wind turbine are calculated. Thus, it is necessary to plan 2-2,5 years for the preparation of the structure of the wind turbine / wind farm. The capacity of new wind power plants - it is also necessary to take into account the fact that the minimum power of new wind turbines starts from 2500 kWh and reaches today up to 7000 kWh, the trend is growing. The cost of new wind power plants - depending on the above technical parameters (height / power / diameter of the rotor), as well as on the choice of the manufacturer, the price of one new wind turbine ranges from 900.000, -EUR to 1.300.000, -EUR per 1 MW. Thus, if it is necessary to install wind turbine with capacity of 2500 kW / 2.5 MW and mast height, for example 100m, on your contry, then only the purchase price of wind turbine will be 2.500.000 - 3.250.000, -EUR. Are there discounts - yes and no. The cost of the project depends on the number of equipments. So, for example, when ordering / planning a whole wind farm, the cost of the entire project will of course be less, since the whole process is optimized and the cost is of course automatically spread over not one wind turbine, but for example 20.

We implement projects of new industrial wind turbines from Germany and Europe around the world

New wind turbines from Europe and Germany

RES-ELITE
Contact Phone: +49-5971-9848212 E-Mail: info(at)reselite.de 48432 Rheine Germany
© 2011-2021 RES-ELITE | Impressum
Look too:
Wind turbines from Europe Used wind turbines Wind turbines from Germany New wind turbines from Europe and Germany
Wind power is rapidly growing throughout the world. Wind energy is referred to as renewable energy and is increasingly referred to as “Green Energy”. The only necessary resource for the use of energy produced by wind power installation (wind turbine) is wind. Thus, the use of this type of energy refers not only to the economically beneficial, but also to one of the most environmentally friendly. By the end of 2017, the total installed capacity of all wind generators in the world was 539 GW and, thus, surpassed the total installed capacity of nuclear energy. Total installed capacity, MW according to GWEC (Global Wind Energy Council) From the data in the table, the fact of the rapid development of the wind power industry is obvious. What you need to know in order to purchase / order new wind turbine and where to start Any manufacturer of wind turbines to start calculating new wind turbine requires data on the wind. To do this, hire a qualified and recognized by Europe company that produces complete study of the wind in the specified area. What research is conducted: Wind speed at various altitudes (60, 70, 80, 90, 100, 110, 120, 130 meters) Airflow density Humidity Also requires data on minimum and maximum air temperatures These wind analysis studies are conducted for at least one year. Based on the data obtained, the manufacturer starts calculating suitable wind turbine for the area. What means “suitable wind turbine” is a wind turbine that will produce electricity with the maximum coefficient in this particular area. Ie, the rated power, mast height, diameter of the rotor of the wind turbine are calculated. Thus, it is necessary to plan 2-2,5 years for the preparation of the structure of the wind turbine / wind farm. The capacity of new wind power plants - it is also necessary to take into account the fact that the minimum power of new wind turbines starts from 2500 kWh and reaches today up to 7000 kWh, the trend is growing. The cost of new wind power plants - depending on the above technical parameters (height / power / diameter of the rotor), as well as on the choice of the manufacturer, the price of one new wind turbine ranges from 900.000, - EUR to 1.300.000, -EUR per 1 MW. Thus, if it is necessary to install wind turbine with capacity of 2500 kW / 2.5 MW and mast height, for example 100m, on your contry, then only the purchase price of wind turbine will be 2.500.000 - 3.250.000, -EUR. Are there discounts - yes and no. The cost of the project depends on the number of equipments. So, for example, when ordering / planning a whole wind farm, the cost of the entire project will of course be less, since the whole process is optimized and the cost is of course automatically spread over not one wind turbine, but for example 20.

We implement projects of new industrial wind turbines from Germany and

Europe around the world

New wind turbines from Europe and Germany

RES-ELITE
© 2011-2021 RES-ELITE | Impressum
Contact Phone: +49-5971-9848212 E-Mail: info(at)reselite.de 48432 Rheine Germany
Look too:
Wind turbines from Europe Used wind turbines Wind turbines from Germany New wind turbines from Europe and Germany
Wind power is rapidly growing throughout the world. Wind energy is referred to as renewable energy and is increasingly referred to as “Green Energy”. The only necessary resource for the use of energy produced by wind power installation (wind turbine) is wind. Thus, the use of this type of energy refers not only to the economically beneficial, but also to one of the most environmentally friendly. By the end of 2017, the total installed capacity of all wind generators in the world was 539 GW and, thus, surpassed the total installed capacity of nuclear energy. Total installed capacity, MW according to GWEC (Global Wind Energy Council) From the data in the table, the fact of the rapid development of the wind power industry is obvious. What you need to know in order to purchase / order new wind turbine and where to start Any manufacturer of wind turbines to start calculating new wind turbine requires data on the wind. To do this, hire a qualified and recognized by Europe company that produces complete study of the wind in the specified area. What research is conducted: Wind speed at various altitudes (60, 70, 80, 90, 100, 110, 120, 130 meters) Airflow density Humidity Also requires data on minimum and maximum air temperatures These wind analysis studies are conducted for at least one year. Based on the data obtained, the manufacturer starts calculating suitable wind turbine for the area. What means “suitable wind turbine” is a wind turbine that will produce electricity with the maximum coefficient in this particular area. Ie, the rated power, mast height, diameter of the rotor of the wind turbine are calculated. Thus, it is necessary to plan 2-2,5 years for the preparation of the structure of the wind turbine / wind farm. The capacity of new wind power plants - it is also necessary to take into account the fact that the minimum power of new wind turbines starts from 2500 kWh and reaches today up to 7000 kWh, the trend is growing. The cost of new wind power plants - depending on the above technical parameters (height / power / diameter of the rotor), as well as on the choice of the manufacturer, the price of one new wind turbine ranges from 900.000, -EUR to 1.300.000, -EUR per 1 MW. Thus, if it is necessary to install wind turbine with capacity of 2500 kW / 2.5 MW and mast height, for example 100m, on your contry, then only the purchase price of wind turbine will be 2.500.000 - 3.250.000, - EUR. Are there discounts - yes and no. The cost of the project depends on the number of equipments. So, for example, when ordering / planning a whole wind farm, the cost of the entire project will of course be less, since the whole process is optimized and the cost is of course automatically spread over not one wind turbine, but for example 20.

We implement projects of

new industrial wind turbines

from Germany and Europe

around the world

New wind turbines from

Europe and Germany

RES-ELITE